ATLAS
HEP header
  • Home
  • People
  • Theses
  • Tracker
  • TileCal
  • Trigger
  • Midwest Tier2 Center
  • Physics
  • Links
  • Join Us
  • HEP

Tile Calorimeter Phase I

Go to Phase II documentation

Upgrade
Mechanical Details
PMT Block
Motherboard for LV & Control Signals
HV Control & Distribution in the Drawer
Digitizer System
Readout Driver
Level 1 Trigger
Interface Board
External LV Supplies
Notes and Writeups
Software for 13bit Version of 3in1 Cards
Radiation Testing
Design Review
Production Readiness Review
Submodule Construction
Commissioning
Trigger Signals
Other Sites with TileCal Info

Radiation Testing at Chicago

  • Proposed Test Procedure
  • Results presented at Production Readiness Review of June '99
  • Neutron Tests of S-LINK/GLINK Hardware
  • Tests for Lot Qualification of ICs in 3-in-1
  • SEE Tests with 60 MeV Protons

Particle Physics +1 773 702 8113 | Fax: +1 773 702 8038
Mailing Address: 5640 S Ellis Ave, Chicago IL 60637
MCP Building Address: 933 East 56th Street, Chicago IL 60637
Accessibility