Pulsar Documentation and earlier talks

For recent talks on L2 upgrade, see RunIIb Level2 upgrade monthly meetings

Talks on ideas of using Pulsar for L2 upgrade

Earlier Pulsar related talks presented at Level 2 meetings

There are talks pesented at Level 2 meetings (see Minutes and Slides from previous Trigger Meetings ). Note that Pulsar was originally designed as a general purpose test tool for Level 2 trigger system.

Pulsar Mini-review (July 24th, 2002) talks

This is the Mini-review before Pulsar prototype.

Documentations (work in progress)

This is still work in progress. We will need to focus on documentation effort in Aug. 2002. There should be a few CDF notes available around the time the prototype board is fully tested. Before that, most of the design details will be first documented on this web page.