Chicago CDF
Group Meeting Agenda
April
20, 2009
-
News/Announcements
- Tev/CDF between April 13 and today:
- Tevatron delivered 59.7 pb-1; 86.8% live; 70.7% good with
silicon.
- Maximum initial luminosity 340.6 e30.
- Shift crews needed
- One ace begining on May 29
- CO for the week begining on May 1
-
Hardware and Data Issues
- (Operation
elog)
- Main sources of downtime:
- RTServer - lost 690.7 nb-1, bad connections to b0cotrol11
- EVB, - lost 478.9 nb-1, home area of EVB was full
- SVX HV - lost 435.2 nb-1.
-