News/Announcements
- Tev/CDF between July 12 and today
- Tevatron delivered 43.2 pb-1 and 86.3 % lived 69.4% with good silicon (80.9% with SVX)
- ISL cooling trip again (store 7977), cleaning filter make work
- Maximum initial lum. was 301.7e30.
- Started shutdown : July18-Aug 16
- CDF big trailer will be used for Long Basedline Neutrino experiments
- UC room need to be moved (old trailer), possibly three rooms with six desks (enough?) my count for UC desk
- Young-Kee would like to move some of computers to WH10(ALTLAS room). We have 10 desktops(including 1 MS window) with 8 monitors so 4 desktop and 2 monitor can be moved in principle.
- Run III proposal
- Spokes got a letter from the director and lab physics advise commitee~(PAC) link
- Positive but, have a few issues
- ICEHP 2010 from this Wed.
- Offline downtime - July 27
- Most of Grid will be SL5 (make SL5 default)
- Most of ILP will be SL5
- Power outage tomorrow (7am)
-
Hardware and Data Issues
-
Main sources of downtime
- STARTUP - 532.8 nb-1 (Waiting good condition, swithing run)
- CMX HV - 363.7 nb-1
- SVX HV - 309.2 nb-1